The ideal low energy house?


What we've set out to do at ECF is to build a house which will use 70% less energy than one built to current building regulations. Its timber frame construction detailing hasn't wavered too far from the 'norm' to present any major problems for a timber frame kit manufacturer, decent building contractor or building control, and the costs of going this 'extra mile' haven't been excessive to the extent that they will be paid back within a decade in terms of reduced energy costs.

In essence, we have built to a standard which is accessable now by most contractors and self builders which is around 5-6 yrs before its time if the UK Government is to fully implement its Code for Sustainable Homes (CSH) strategy, on which this building should come in at around 3-4 on a scale of 1-6. There is clearly some distance to go from this to 'zero carbon', so what represents the 'optimum' for 'Level 6 living', the magical zero carbon level required by 2016 for all new homes?


Well, the same principles apply, namely...



  • building orientation to maximise solar gain in winter, spring and autumn whilst avoiding overheating in summer

  • high levels of insulation around the entire building envelope

  • high levels of airtightness coupled with heat recovery ventilation

  • highly insulated and well sealed doors and windows

...but for CSH level 6 the wall insulation would need to be increased to >300mm (from our 200mm), roof insulation to >450mm (from our 350mm) and windows to be triple glazed krypton filled units with insulated frames and glazing spacers (vs. our argon filled double glazed units). This would result in a building which could feasibly rely on the heat given off by its occupants and collected though its windows to keep it at a comfortable temperature without having to introduce a heating system. Construction might rely on internal masonry/concrete walls to store heat and keep a steady internal temperature, with the insulation fixed to the outside of this.


On the face of it quite simple, but a seriously long way from what the UK housebuilding industry is used to. Roll on 2016.....there is a lot of catching up to do and mindsets to be re-programmed.


Comments: 0 (Add)

Check Availability

Loading